| 000 | 00995 a2200313 4500 | ||
|---|---|---|---|
| 001 | 68956 | ||
| 999 |
_c68956 _d18786 |
||
| 003 | TR-AnTOB | ||
| 005 | 20200807150241.0 | ||
| 008 | 940215s1995 njua b 001 0 eng | ||
| 010 | _a94008256 //r962 | ||
| 020 | _a0137067577 | ||
| 040 |
_aDLC _cDLC |
||
| 041 | _aeng | ||
| 049 | _aBGZA | ||
| 050 |
_aTS157.5 _b.P56 1995 |
||
| 090 | _aTS157.5 .P56 1995 | ||
| 100 |
_aPinedo, Michael _942153 |
||
| 245 | 0 |
_aScheduling : _btheory, algorithms, and systems / _cMichael Pinedo. |
|
| 264 | 1 |
_aEnglewood Cliffs, N.J. : _bPrentice Hall, _cc1995. |
|
| 300 |
_axiv, 378 p. : _bill. ; _c25 cm. |
||
| 490 | 0 | _aPrentice Hall international series in industrial and systems engineering | |
| 504 | _aIncludes bibliographical references (p. 356-372) and indexes. | ||
| 601 | _a0023614 | ||
| 650 | 0 |
_aProduction scheduling _92172 |
|
| 650 | 7 |
_aÜretim programlama _2etuturkob _942154 |
|
| 902 | _aMÇ | ||
| 942 | _cBK | ||