| 000 | 00798 a2200265 4500 | ||
|---|---|---|---|
| 001 | 10782 | ||
| 999 |
_c10782 _d730 |
||
| 003 | TR-AnTOB | ||
| 005 | 20200807150235.0 | ||
| 008 | 960429s1997 maua b 001 0 eng | ||
| 010 | _a96008656 | ||
| 020 | _a0534954561 (acid-free paper) | ||
| 040 |
_aDLC _cDLC _dDLC |
||
| 041 | _aeng | ||
| 050 | 0 |
_aTS157.5 _b.S85 1997 |
|
| 090 | _aTS157.5 .S85 1997 | ||
| 100 |
_aSule, D. R. _92171 |
||
| 245 | 0 |
_aIndustrial scheduling / _cDileep R. Sule. |
|
| 264 | 1 |
_aBoston : _bPWS Pub. Co., _cc1997. |
|
| 300 |
_aviii, 322 p. : _bill. ; _c24 cm. + _e1 computer disk (3 1/2 in.). |
||
| 504 | _aIncludes bibliographical reerences and index. | ||
| 538 | _aSystem requirements for accompanying computer disk: IBM PC. | ||
| 650 | 0 |
_aProduction scheduling _92172 |
|
| 942 | _cBK | ||