MARC details
| 000 -LEADER |
| fixed length control field |
05048 a2200337 4500 |
| 001 - CONTROL NUMBER |
| control field |
200043737 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
TR-AnTOB |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20240905162527.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
111205s2009 nju 001 0 |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
9780470181102 (cloth) |
|
| International Standard Book Number |
0470181109 (cloth) |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
DLC |
| Transcribing agency |
DLC |
| Modifying agency |
BTCTA |
| -- |
TR-AnTOB |
| 041 ## - LANGUAGE CODE |
| Language code of text/sound track or separate title |
İngilizce |
| 050 00 - LIBRARY OF CONGRESS CALL NUMBER |
| Classification number |
TH880 |
| Item number |
.I57 2009 |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
TH880 .I57 2009 |
| 245 04 - TITLE STATEMENT |
| Title |
The integrative design guide to green building : |
| Remainder of title |
redefining the practice of sustainability / |
| Statement of responsibility, etc. |
7group (John Boecker, Scot Horst, Tom Keiter, Andrew Lau, Marcus Sheffer, and Brian Toevs) and Bill Reed. |
| 264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE |
| Place of production, publication, distribution, manufacture |
Hoboken, N.J. : |
| Name of producer, publisher, distributor, manufacturer |
Wiley, |
| Date of production, publication, distribution, manufacture, or copyright notice |
c2009. |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xiv, 398 p., [16] p. of plates : |
| Other physical details |
ill. (some col.), maps ; |
| Dimensions |
24 cm. |
| 490 0# - SERIES STATEMENT |
| Series statement |
A Wiley book on sustainable design |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
|
| 505 0# - FORMATTED CONTENTS NOTE |
| Formatted contents note |
1. Many minds : From master builder to the twenty-first century: where we are and how we got here : The master builder ; The Siena Duomo -- The age of specialization -- Stop and reflect: our current process : Siloed optimization ; The abyss between design and construction professionals ; Doing less damage by adding technologies -- The call before us -- 2. Building as an organism : A shift in thinking: no part or system in isolation -- Buildings as organisms : Tunneling through the cost barrier ; Lessons learned from high-performance windows -- Project teams as organism : Fostering an interdisciplinary process: "a deer in the headlights" ; A team of colearners and the learning wheel ; The composite master builder -- 3. Reframing sustainability : What is sustainability? -- The trajectory of sustainability in practice : The technical story of Willow School ; A more compelling and vital story of place ; Re-membering our role in nature ; Reciprocal relationships within the larger system -- The role of the mental model: from products to a new mind-set -- Nested subsystems -- Solving for pattern -- 4. Aligning values, purpose, and process : Introduction to the discovery phase -- The four Es -- Questioning assumptions -- Creating alignment : Aligning the team ; Aligning with the client -- Fostering an iterative process -- Integrating intentions with purpose : The four key subsystems ; Aligning dollars and resources ; The "touchstone" exercise ; Aligning with values ; Redefining success -- 5. The discovery phase : This is not a cookbook -- Here’s where we are -- Stop and reflect : What’s working? ; What’s not working? ; How can we do (and think about) this differently? -- Integrative process overview -- Three-part structure : Part A. Discovery ; Part B. Design and construction ; Part C. Occupancy, operations, and performance feedback -- Part A. Discovery : Stage A1. Research and analysis: preparation ; Stage A2. Workshop no.1: Alignment of purpose and goal-setting ; Stage A3. Research and analysis: evaluating possible strategies ; Stage A4. Workshop no.2: Conceptual design exploration ; Stage A5. Research and analysis: Testing conceptual design ideas -- |
|
| Formatted contents note |
6. Schematic design : Entering part B: Design and construction -- Here’s where we are -- Stop and reflect : What’s working? ; What’s not working? ; How can we do (and think about) this differently? -- Part B. Design and construction : Stage B1. Workshop no.3: Schematic design kickoff: bringing it all together (without committing to building form ; Stage B2. Research and analysis: Schematic design: Bringing it all together (and now committing to building form) -- 7. Design development and documentation : Here’s where we are -- Stop and reflect : What’s working? ; What’s not working? ; How can we do (and think about) this differently? ; Stage B.3. Workshop no.4: Design development kickoff: it is brought together: does it work? ; Stage B4. Research and analysis: Design development: optimization ; Stage B5. Workshop no.5: Construction documents kickoff: performance verification and quality control ; Stage B6. Construction documents: no more designing -- 8. Construction, operations, and feedback : The evolving commissioning process -- Learning from feedback -- Here’s where we are -- Stop and reflect : What’s working? ; What’s not working? ; How can we do (and think about) this differently? ; Stage B7. Bidding and construction: aligning with the builder: becoming a team -- Part C. Occupancy, operations, and performance feedback : Stage C1. Occupancy: feedback from all systems -- Epilogue : Evolving the field : A transformational process -- Shifting the paradigm -- The fifth system. |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Sustainable buildings |
| General subdivision |
Design and construction |
| 9 (RLIN) |
79257 |
|
| Topical term or geographic name entry element |
Leadership in Energy and Environmental Design Green Building Rating System |
| 9 (RLIN) |
79258 |
|
| Topical term or geographic name entry element |
Sürdürülebilir yapılar |
| General subdivision |
Tasarım ve yapım |
| Source of heading or term |
etuturkob |
| 9 (RLIN) |
79259 |
| 700 1# - ADDED ENTRY--PERSONAL NAME |
| Personal name |
Reed, Bill, |
| Dates associated with a name |
1953- |
| 9 (RLIN) |
79255 |
| 710 2# - ADDED ENTRY--CORPORATE NAME |
| Corporate name or jurisdiction name as entry element |
7group (Organization) |
| 9 (RLIN) |
79256 |
| 856 41 - ELECTRONIC LOCATION AND ACCESS |
| Uniform Resource Identifier |
<a href="http://www.loc.gov/catdir/toc/ecip0827/2008038602.html">http://www.loc.gov/catdir/toc/ecip0827/2008038602.html</a> |
| Materials specified |
Table of contents only |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) |
| Koha item type |
Book |